Study of facilities

Document prepared by CENACE that integrates the cost estimate provided by the Carrier, Contractor or Distributor, which includes, without limitation, the defined infrastructure, characteristics of the protection systems, communication, measurement and control, physical spaces in substations, arrangements and modernization in the substations and the Specific Characteristics of the Infrastructure.

ECI - Estimation of Investment Costs
Return